Saturday, December 29, 2012

Zumwalt Deckhouse



BATH , Maine (Dec. 14, 2012) The 1,000-ton deckhouse of the future destroyer USS Zumwalt (DDG 1000) is craned toward the deck of the ship to be integrated with the ship's hull at General Dynamics Bath Iron Works. The ship launch and christening are planned in 2013. (U.S. Navy photo)


FROM STRATEGYPAGE.COM

Zumwalt Deckhouse

Posted 12/27/2012